Connecting Odds
Rolls-Royce SMR

Project Manager - Long Lead Items (LLI)

Rolls-Royce SMR
Manchester, Greater ManchesterPosted 3 days agoDiscoveredMatch locked
Full TimeConsultancy Jobs

About the role

Project Manager - Long Lead Items (LLI) Location: Derby, Manchester or Warrington Salary Range - £50,600 - £66,500 At Rolls-Royce SMR, we're delivering a British solution to a global energy challenge. Our Small Modular Reactor programme is helping shape the future of low-carbon energy and creating one of the UK's most exciting advanced engineering projects. As we move towards deployment, we're str

Not included in the source posting: about the role, what you'll do, qualifications, benefits.

Who can apply

The employer didn't state any visa, work authorization, citizenship or clearance requirements in this posting. Confirm with the employer before applying.

Read automatically from the employer's posting text. Always confirm with the employer — requirements can change after a job is published.