Design Project Lead – Data Center Construction
Turner & Townsend
San Francisco, CaliforniaPosted 5 days agoDiscoveredMatch locked
Full-timeCreative & Design Jobs
About the role
Job Description Turner & Townsend is seeking an experienced Design Project Lead to join our team. As an integral part of the Design Development and Delivery Team, this role will operate as the Design Project Lead overseeing the design and construction administration as an Owner's Representative, and lead the Civil, Structural, Landscape, Architecture (CSLA) disciplines as a subject matter expert.
Not included in the source posting: about the role, what you'll do, qualifications, benefits.
Who can apply
The employer didn't state any visa, work authorization, citizenship or clearance requirements in this posting. Confirm with the employer before applying.
Read automatically from the employer's posting text. Always confirm with the employer — requirements can change after a job is published.