Connecting Odds

Chief Officer (SDPO) - Windfarm Installation Unit

V.Group
London, UKPosted about 1 month agoDiscoveredMatch locked
contractEnergy, Oil & Gas Jobs

About the role

Vessel Information Type: Windfarm Installation Unit Gross Tonnage: 19892 Dead Weight: 7062 Built Year: 2024 Flag: PAN Additional Requirements WTIV/SPJUB in rank experience is mandatory Strong offshore experience required Joining in Taiwan Joining at the earliest.

Not included in the source posting: about the role, what you'll do, qualifications, benefits.

Who can apply

The employer didn't state any visa, work authorization, citizenship or clearance requirements in this posting. Confirm with the employer before applying.

Read automatically from the employer's posting text. Always confirm with the employer — requirements can change after a job is published.